Manufacturing & factories

Your plant runs as a line. Your back office can too.

Customer POs, supplier certificates, inspection records and invoices still move by email and spreadsheet. Cereeon runs the core lines plus Production and Quality, on your records and within your limits.

Book a call Onboarding now
Where the margin goes

What slows manufacturing back offices down.

  • 01

    Customer POs re-keyed from email and PDF

  • 02

    Supplier certificates tracked in spreadsheets

  • 03

    Vendor bills paid over what was ordered

  • 04

    Overdue invoices chased by hand

Where it pays first

Three lines that pay first in manufacturing.

Winning the right work, and the lines your sector runs every day.

01 · RFPs & tenders

Bid on the tenders you can win.

Public tenders are ranked by your chance of winning it, from your past bids, services, rates, regions and capacity. You only write the bids worth writing.

  • Public tenders screened daily, ranked by win chance
  • A bid/no-bid call with the gaps, when the RFP arrives
  • Answers drafted from your winning past bids, deadlines tracked
  1. Tender finder Autonomous
  2. Bid qualification Autonomous
  3. Response drafting Suggest
  4. Bid tracker Autonomous
Bid summaryBID-0144
Tender
Network refresh, 40 sites
Win chance
High · 3 similar bids won
Mandatory
11 of 12 met

Done by Bid qualification Autonomous

Example · names and numbers invented
02 · Production

Orders planned against real capacity.

Orders become work orders against your BOMs, capacity and stock. Late job cards are caught early and the customer hears from you first.

  • Work orders released against real capacity and stock
  • Shortfalls requested before they stop the line
  • Late work caught early, dates revised, customer told
  1. Production planner Review
  2. Shop-floor follow-up Autonomous
Work orderWO-3307
Order
SO-1142 · 400 units
BOM
Enclosure v3
Promised
Thursday

Done by Production planner Review · reviewed by Planner

Example · names and numbers invented
03 · Quality

Certificates read, rejections raised as NCRs.

Certificates and test results are read into inspections against your tolerances, and every rejection raises an NCR with its corrective action.

  • Every certificate read into an inspection against tolerance
  • Rejections raise the NCR with its corrective action
  • Supplier claim or rework order raised with it
  1. Inspection Autonomous
  2. Nonconformance Suggest
InspectionQI-0451
Batch
B-2207
Source
Supplier CoA, gauge export
Parameters
14 of 14 in tolerance

Done by Inspection Autonomous

Example · names and numbers invented
The make to order route

An order is won, planned, built, inspected, invoiced and paid.

Make to order route Data in → action out Lines 4 · Stations 6 · Cycle 00
  1. Sales
  2. Production
  3. Quality
  4. Finance
In · PO · any format, any language Handoff between lines · click a station Out · paid
Every line

10 lines, 20 stations.

Your sector's own lines first, then the core lines every business runs. Every station runs at the autonomy level you set for each action.

  • Manufacturing · 2 stations

    Production

    Orders planned, released and kept on time.

    1. Production planner

    2. Shop-floor follow-up

    Measured byOn-time delivery

  • Manufacturing · 2 stations

    Quality

    Certificates read, rejections raised as NCRs.

    1. Inspection

    2. Nonconformance

    Measured byFirst-pass yield

  • Core · 4 stations

    RFPs & tenders

    Bids found, answered and submitted on time.

    1. Tender finder

    2. Bid qualification

    3. Response drafting

    4. Bid tracker

    Measured byBids submitted on time

  • Core · 2 stations

    Sales

    Quotes out, won work in.

    1. Quoting

    2. Quote follow-up

    Measured byWin rate

  • Core · 2 stations

    Service Desk

    Every request in, triaged and answered.

    1. Triage

    2. Client updates

    Measured bySLA %

  • Core · 2 stations

    Purchasing

    Material in on time, warranty value recovered.

    1. Materials

    2. Warranty claims

    Measured byWarranty value recovered

  • Core · Records

    Inventory

    Stock the other lines draw on.

    No station: Materials reads stock

  • Core · 3 stations

    Finance

    Invoiced, matched, collected, reported.

    1. Billing

    2. Collections

    3. SLA reports

    Measured byDays to invoice

  • Core · 2 stations

    People

    Cover planned, staff answered.

    1. On-call gaps

    2. Staff assistant

  • Core · 1 station

    Suppliers & subcontractors

    A supply network that stays compliant.

    1. Compliance

    Measured byOnboarding time

Interlocks

Rules that hold here, whatever an agent decides.

  • A non-compliant vendor can't take the work

    Expired insurance or a missing licence takes a vendor out of dispatch until it's renewed.

  • A bill can't exceed the order without approval

    A vendor bill over what was ordered stops for a person to decide.

  • A test on an out-of-calibration instrument can't pass

    Results from an instrument past its calibration date are rejected, not filed.

Questions

Manufacturing: common questions.

How does Cereeon fit with our systems?

Cereeon is an action line: agents that work your records and take the actions, configured to your rules and data. Data in → action out.

How does Cereeon fit a factory?

Factories run the core lines every business has, plus Production and Quality. Every line and station is modular, so the set is assembled around how your plant runs.

Other sectors

The same core lines, other businesses.

30-minute call

Bring one process that slows you down.

We'll walk it through the line with you: what comes in, what each station would do, and which of its actions earn autonomy first.