Your plant runs as a line. Your back office can too.
Customer POs, supplier certificates, inspection records and invoices still move by email and spreadsheet. Cereeon runs the core lines plus Production and Quality, on your records and within your limits.
What slows manufacturing back offices down.
- 01
Customer POs re-keyed from email and PDF
- 02
Supplier certificates tracked in spreadsheets
- 03
Vendor bills paid over what was ordered
- 04
Overdue invoices chased by hand
Three lines that pay first in manufacturing.
Winning the right work, and the lines your sector runs every day.
Bid on the tenders you can win.
Public tenders are ranked by your chance of winning it, from your past bids, services, rates, regions and capacity. You only write the bids worth writing.
- Public tenders screened daily, ranked by win chance
- A bid/no-bid call with the gaps, when the RFP arrives
- Answers drafted from your winning past bids, deadlines tracked
- Tender finder Autonomous
- Bid qualification Autonomous
- Response drafting Suggest
- Bid tracker Autonomous
- Tender
- Network refresh, 40 sites
- Win chance
- High · 3 similar bids won
- Mandatory
- 11 of 12 met
Done by Bid qualification Autonomous
Orders planned against real capacity.
Orders become work orders against your BOMs, capacity and stock. Late job cards are caught early and the customer hears from you first.
- Work orders released against real capacity and stock
- Shortfalls requested before they stop the line
- Late work caught early, dates revised, customer told
- Production planner Review
- Shop-floor follow-up Autonomous
- Order
- SO-1142 · 400 units
- BOM
- Enclosure v3
- Promised
- Thursday
Done by Production planner Review · reviewed by Planner
Certificates read, rejections raised as NCRs.
Certificates and test results are read into inspections against your tolerances, and every rejection raises an NCR with its corrective action.
- Every certificate read into an inspection against tolerance
- Rejections raise the NCR with its corrective action
- Supplier claim or rework order raised with it
- Inspection Autonomous
- Nonconformance Suggest
- Batch
- B-2207
- Source
- Supplier CoA, gauge export
- Parameters
- 14 of 14 in tolerance
Done by Inspection Autonomous
An order is won, planned, built, inspected, invoiced and paid.
- Sales
- Production
- Quality
- Finance
10 lines, 20 stations.
Your sector's own lines first, then the core lines every business runs. Every station runs at the autonomy level you set for each action.
-
Manufacturing · 2 stations Production
Orders planned, released and kept on time.
-
Production planner
-
Shop-floor follow-up
Measured byOn-time delivery
-
-
Manufacturing · 2 stations Quality
Certificates read, rejections raised as NCRs.
-
Inspection
-
Nonconformance
Measured byFirst-pass yield
-
-
Core · 4 stations RFPs & tenders
Bids found, answered and submitted on time.
-
Tender finder
-
Bid qualification
-
Response drafting
-
Bid tracker
Measured byBids submitted on time
-
-
Core · 2 stations Sales
Quotes out, won work in.
-
Quoting
-
Quote follow-up
Measured byWin rate
-
-
Core · 2 stations Service Desk
Every request in, triaged and answered.
-
Triage
-
Client updates
Measured bySLA %
-
-
Core · 2 stations Purchasing
Material in on time, warranty value recovered.
-
Materials
-
Warranty claims
Measured byWarranty value recovered
-
-
Core · Records Inventory
Stock the other lines draw on.
No station: Materials reads stock
-
Core · 3 stations Finance
Invoiced, matched, collected, reported.
-
Billing
-
Collections
-
SLA reports
Measured byDays to invoice
-
-
Core · 2 stations People
Cover planned, staff answered.
-
On-call gaps
-
Staff assistant
-
-
Core · 1 station Suppliers & subcontractors
A supply network that stays compliant.
-
Compliance
Measured byOnboarding time
-
Rules that hold here, whatever an agent decides.
A non-compliant vendor can't take the work
Expired insurance or a missing licence takes a vendor out of dispatch until it's renewed.
A bill can't exceed the order without approval
A vendor bill over what was ordered stops for a person to decide.
A test on an out-of-calibration instrument can't pass
Results from an instrument past its calibration date are rejected, not filed.
Manufacturing: common questions.
How does Cereeon fit with our systems?
Cereeon is an action line: agents that work your records and take the actions, configured to your rules and data. Data in → action out.
How does Cereeon fit a factory?
Factories run the core lines every business has, plus Production and Quality. Every line and station is modular, so the set is assembled around how your plant runs.
The same core lines, other businesses.
Field service & contractors
From the service request to the paid invoice, on one line.
Distribution & logistics
Orders, deliveries and claims, handled before they pile up.
Professional & facility services
Service requests in, signed-off work and paid invoices out.
Bring one process that slows you down.
We'll walk it through the line with you: what comes in, what each station would do, and which of its actions earn autonomy first.